Recently, CCCC Tunnel Engineering Co., Ltd. won the bid for a bridge project that running through Harbin-Dalian PDL. The contract value amounts to RMB134 million with construction period of 15 months.
The project is composed of framed bridge (including one vehicle frame and two auxiliary road frames), one 113 m-long interchange bridge, and relatively road and drainage engineering.
Source from: CCCC Tunnel Engineering Co., Ltd.